Projects
Frontcovers
Top Favorites
Latest
Competitions
Albums
Details
Newsletters
Destelbergen, Belgium

Midras

office building + apartment

Com_grauxbayens_builthings_29012010-266com_nathan_22_12_08_g5-526-1_large

The existing situation consists of a central volume flanked by two uniform wings. The assignment was to transform the central volume into a dynamic office building with a housing-unit. At the frontside of the building the architects chose not to break the strong horizontality but to enhance it instead by creating a balanced composition of stacked white volumes. The spacing between these massive volumes and the recessed windows creates an interesting number of vistas.

Com_grauxbayens_builthings_29012010-273com_nathan_22_12_08_g5-526_large

In strong contrast with the existing wings of the building nothing of the interior organization is given away from the outside: the volume protects itself from the busy road situated in front of it. The interior organization is composed in a manner to allow a maximum amount of natural daylight into the building, between the two 10meter high walls separating the central volume from the adjacent buildings.

Com_grauxbayens_builthings_29012010-253com_nathan_22_12_08_g5-526-1_large

The office is located on the ground floor, level -1 and level +1. The penthouse with terraces stretches out from front to back on the upper floor . On the backside a 3 story high lightshaft is brought into the building while at the frontside a void separates level +1 from the façade and creates a relation with the underlying floors. On the ground level two staircases connect to floor -1 in a way that it becomes fully a part of the office.

Com_grauxbayens_builthings_29012010-137com_nathan_22_12_08_g5-526_large

Com_grauxbayens_builthings_29012010-257com_nathan_22_12_08_g5-526-1_large

Com_grauxbayens_builthings_29012010-0405com_nathan_22_12_08_g5-526_large

Com_grauxbayens_builthings_29012010-0414com_nathan_22_12_08_g5-526-1_large

Com_projectlumière_28012011com_grauxbayens_builthings_29012010-0280com_nathan_22_12_08_g5-526-1_large

Com_projectlumière_28012011com_grauxbayens_builthings_29012010-0295com_nathan_22_12_08_g5-526-1_large

Com_grauxbayens_builthings_29012010-0333com_nathan_22_12_08_g5-526-1_large

Com_grauxbayens_builthings_29012010-285com_nathan_22_12_08_g5-526_large

Com_grauxbayens_builthings_29012010-367com_nathan_22_12_08_g5-526_large

Com_grauxbayens_builthings_29012010-0378com_nathan_22_12_08_g5-526_large

Com_grauxbayens_builthings_29012010-310com_nathan_22_12_08_g5-526-1_large

Com_grauxbayens_builthings_29012010-0402com_nathan_22_12_08_g5-526_large

Com_grauxbayens_builthings_29012010-0362com_nathan_22_12_08_g5-526-1_large

07-005-facade_large

07-005-groundfloor_large

Groundfloor

07-005-floor-_1_large

Floor +1

07-005-floor-_2_large

Floor +2

07-005-floor--1_large

Floor -1

07-005-section_large

1