Projects
Frontcovers
Top Favorites
Latest
Competitions
Albums
Details
Newsletters
Bure-Saudron, France

EDF Archives Centre

Com_lan_bure_201204240230_large

A strategic project providing a social and environmental positive impact on the region. The building fully integrates into the landscape as well as it meets environmental quality standards, a fundamental aspect for the EDF’s building strategy. This building, symbol of the long term and visible presence of EDF in the Meuse and Haute Marne region, hosts the company’s industrial records.

Com_lan_bure_201204240269_large

Within the framework of the Meuse and Haute Marne economic support programme, EDF has decided to centralise all its intermediary Engineering Production Management archives in Bure-Saudron. Until now, these paper copy archives had been stored in nuclear, hydraulic and thermal production units, as well as in engineering units and associated services.

Com_lan_bure_201204240179_large

The new centre allows the documents’ organisation and it also ameliorates the storage and the utilisation processes. These archives, on paper-based and microfilm-based formats, will occupy about 70 km of shelves. The building has also a laboratory for micro-films, specifically designed for this purpose.

Com_lan_bure_201204240160_large

The concept. We realised a five level, 19 m high building within a plot of 3.30 hectares comprehensive of an archives area covering approximately 1,400 m² and a total surface of approximately 7,000 m². This approach results in: - considerable saving in terms of the building’s envelope - improved functionality translated by a reduced number of kilometres covered per year, - a marginal impact on the landscape (with view points at a considerable distance from the building), - the possibility of a maximum use of the excavated land around the building’s footprint to control water recuperation and treatment on the site, - an energetically and environmentally extremely high performance building, - the creation of a symbol representative of the approach taken by the Mouse and Haute Marne economic support programme.

Com_lan_bure_201204240194_large

The typology. An archives storage building needs to have a considerable inertia with a minimal exchange with its external setting. The need for fast and simple site management and optimum storage efficiency led us to develop a simple and rational layout. The building is divided into 2 programmes: archives and offices. The archives’ part is composed by 20 storehouses of 200 m² each; with regulated temperature and hygrometry. The blocks can resist fire for 2 hours and they are equipped with a sprinkling system. The offices’ part is N/W oriented, embedded in a natural slope planted with trees and plants. The offices have an ideal view on the surrounding landscape.

Com_lan_bure_201204250372_large

The landscape Tree-planted surfaces give some advantages: from an ecological point of view the trees protect the building against climatic issues. From an aesthetical point of view – and within an idea of landscape integration - they complete the building by inserting a pattern recurring from the landscape: the “merlons”, narrow strips of land planted with hardwoods. The project of the landscape foresees the framing of the views from the offices by planting vegetable masses. Some framings already exist from the highway in the project’s direction. A game of sequences is set in combination with the architectural plan in order to vary the visuals and to put an accent on the building’s continuity with its landscape.

Com_lan_bure_201204250379_large

The facade The elevations will incorporate a total of 120,000 stainless steel studs. Stainless steel studs (7 cm diameter and 1 mm thick) will be incorporated into the formwork during the casting of the integrally coloured prefabricated concrete elevation panels. The panels will be 15.65 m high and either 2.26 m or 2.33 m wide depending on whether they are on the long or short side of the building. The 8 cm thick panels will be reinforced with concrete ribbing (+ 7 cm). The complex will be suspended from reinforced concrete walls and held in position using distancing jacks. The elevations will have a total thickness of 68 cm. The facade’s building process was the subject of a patent.

Com_lan_bure_201204240120_large

Com_lan_bure_201204250430_large

Com_lan_bure_201204240307_large

Com_lan_bure_201204250486_large

Com_lan_bure_201204250776_large

Com_lan_bure_201204250886_large

Com_lan_bure_201204250956_large

Lan_bure_edf_lanoo-bd-_2__large

Lan_bure_edf_lanoo-bd-_14__large

Lan_bure_edf_lanoo-bd-_3__large

Lan_bure_edf_lanoo-bd-_4__large

Lan_bure_edf_lanoo-bd-_6__large

Lan_bure_edf_lanoo-bd-_1__large

Lan_bure_edf_lanoo-bd-_7__large

Lan_bure_edf_lanoo-bd-_8__large

Lan_bure_edf_lanoo-bd-_9__large

Lan_bure_edf_lanoo-bd-_10__large

Lan_bure_edf_lanoo-bd-_11__large

Lan_bure_edf_lanoo-bd-_12__large

Lan_bure_edf_lanoo-bd-_13__large

Lan_bure_edf_lanoo-bd-_15__large

Edf-lan-section-d_large

Edf-lan-plan--rdc_large

Edf-lan-plan--level2_large

Edf-lan-section-a_large

Edf-lan-section-b_large

Edf-lan-section-c_large

Edf-lan-situation-plan_large

Edf-lan-axo-lvel1_large

Edf-lan-axo-rdc_large

Edf-lan-detail-facade-1_large

Edf-lan-detail-facade-2_large

4