Barcelona, Spain

'Creation Factory' in the old Fabra & Coats main building

Sant Andreu, Barcelona
Manuel Ruisánchez Capelastegui, Francesc Bacardit

01_1324_fabra_i_coats_f_mateo_large

The central structure of the Fabra & Coats complex is a four-storey building which consists of three juxtaposed bodies. A large edifice located to the west and two smaller ones oriented to the east and north. Leaning on the east facade of this great building, a single-storey construction houses the ‘boiler room’, which used to supply energy to the whole Fabra & Coats compound. The building, built in 1910, has a total of 14,000 m2.

02__fabra_i_coats_large

The intervention in Fabra & Coats was highly respectful of the existing building. More of a transformation, it is a recovery of an industrial space. Despite the complexity of the functional program – a ‘factory’ of artistic creation, a school of arts and a Heritage Conservation Center and also including a ‘Museum of labor’ – constructive and structural elements were kept, as well as some of the original systems and facilities.

03_1189_fabra_i_coats_f_mateo_large

.

04_1495_fabra_i_coats_f_mateo_large

The organization of the access systems and routes on the ground floor allows a clear distribution of the different functional programs and an easy occupation and clearing out of the spaces which host these, ensuring the proper functioning of the building’s busiest parts: the common areas of public use. The upper floors host creation and training programs.

05_1065_fabra_i_coats_f_mateo_large

© Ferran Mateo

.

06_0745_fabra_i_coats_f_mateo_large

The main building houses the bulk of the activity. The other two masses – their characteristics and dimensions make them more independent -, are used for support and management of the center and can maintain a more direct relationship with the public that accesses the higher plants.

07_1478_fabra_i_coats_f_mateo_large

.

08_0781_fabra_i_coats_f_mateo_large

The strategy has been the inclusion of technological components (‘Jack’- a new vertical communication and systems shaft, music ‘boxes’, etc…) that can accommodate specific functions, and a flexible division of the space has been designed with a cable-and-sails system and allows to change the space according to needs.

09_1095_fabra_i_coats_f_mateo_large

.

10_montaje_lonas_03_large

.

11_057_judit_contreras_large

.

12-config_lonas_large

The structures created by the sails can be installed in different heights depending on the necessity of privacy and on the type of work to be performed or executed. Flexibility is also achieved with a variety of thickness and transparency of the separating material. When certain hardness is required in the separation –especially in the need of a vertical insulation- the rigid elements appear in the form of recycled wood creating the “music boxes” that are placed, whenever possible, close to the “jack” service.

13_1443_fabra_i_coats_f_mateo_large

On the top floor, with the aim to obtain higher and even more diaphanous spaces for the activity of circus, dance and theater, two rows of pillars were underpinned by a system of Vierendeel type trusses which, in turn, serve as skylights creating a Saw-tooth roof.

14_0737_fabra_i_coats_f_mateo_large

As to the facades, the intervention sought to demolish certain bodies added along the years and the restoration of the building form, recovering its original image.

15_075_judit_contreras_large

16_068_judit_contreras_r_large

17_mira_edu_ferrer_alcover-88_large

18_bfc-situacio_escala_1_2000_large

19_bfc__pl_baixa_large

20_bfc__pl_1_large

21_bfc__pl_2_large

22_bfc__pl_3_large

23_bfc_seclongcajas_large

24_bfc_seclonglonas_large

4