© Pedro Pegenaute . Published on May 24, 2012.
The main building is constructed on one floor with the classrooms coming off a central corridor, which is then visible from outside through several terraces.
© Pedro Pegenaute . Published on May 24, 2012.
This central corridor has a large skylight and is the formal base of the project. Rooms such as the library and the technology classroom stand out from the ground floor and create linked outdoor spaces.
© Pedro Pegenaute . Published on May 24, 2012.
The separate gym is linked to the main building with a covered area which also forms the main entrance hall of the school.
© Pedro Pegenaute . Published on May 24, 2012.
Concrete and dark vertical plates are used across the whole building.
© Pedro Pegenaute . Published on May 24, 2012.
© BAAS Jordi Badia . Published on May 24, 2012.
© BAAS Jordi Badia . Published on May 24, 2012.
© BAAS Jordi Badia . Published on May 24, 2012.