Projects
Frontcovers
Top Favorites
Latest
Competitions
Albums
Details
Newsletters
Coimbra, Portugal

N10-II Sports Facility

2012_europaconcorsi_n10_img

Our approach to the design of N10-Eiras indoor sports facility was determined twofold: on the one hand by the specific characteristics of the existing industrial pavilion in which we ought to insert our solution. On the other hand by the brief, which asked for three main areas: reception; changing rooms and showers; and a party room. One volume was created, organizing the two main areas at both sides of the reception area, which is also where the entrance is located. The new volume thus created occupies the entire width of the existing pavilion, and its own width results from the subtraction of the football field from the pavilion’s total length. The building system defines the materialization of the volume. A porticoed frame made of American pine wood beams and columns creates the basic structure.

2012_europaconcorsi_n10_img

The infill of this structure, both in the roof as in the walls, is made through the use of MDF boards, assembled in such a way as to perform both structural and formal roles in the overall construction. The raw use of the MDF boards is followed by a straightforward use of white ceramic tiles in the changing rooms and showers, and by the design of the furniture components, which are also made of raw pine wood elements and black lacquered MDF panels. The layout of the illumination devices was designed in order to accomplish an intense and expressive plasticity out of the volume’s formal and material characteristics. A tunnel-like element pierces the pavilion’s existing wall to announce in the outside the entrance to the facility.

2012_europaconcorsi_n10_img

2012_europaconcorsi_n10_img

2012_europaconcorsi_n10_img

2012_europaconcorsi_n10_img

2012_europaconcorsi_n10_img

2012_europaconcorsi_n10_img

2012_europaconcorsi_n10_img

2012_europaconcorsi_n10_img

2012_europaconcorsi_n10_img

2012_europaconcorsi_n10_img

2012_europaconcorsi_n10_img

2012_europaconcorsi_n10_img

2012_europaconcorsi_n10_img

2012_europaconcorsi_n10_img

2012_europaconcorsi_n10_img

2012_europaconcorsi_n10_img

2012_europaconcorsi_n10_img

2012_europaconcorsi_n10_img

2012_europaconcorsi_n10_img

2012_europaconcorsi_n10_img

2012_europaconcorsi_n10_img

2012_europaconcorsi_n10_img

2012_europaconcorsi_n10_img

2012_europaconcorsi_n10_01_general-plan_large

2012_europaconcorsi_n10_02_plan-level_large

2012_europaconcorsi_n10_03_plan-level_large

2012_europaconcorsi_n10_04_longitudinal-section_large

2012_europaconcorsi_n10_09_section_large

2012_europaconcorsi_n10_12_section_large

2012_europaconcorsi_n10_10_section-details_large

1. Waterproof plasterboard ceiling with 13mm thickness 2. Wooden pine beam 120x60mm 3. Metallic structure 4. Waterproof plasterboard coating with 26mm thickness 5. MDF panel 2750x1400x16mm 6. Screed rubbed polished finish 7. Steel angle 60x60mm 8. MDF panel 600x1400x16mm 9. Sliding door with 2540x1468x35mm composed of MDF with 16mm thick over the 40x15mm frame beams 10. Cabinet suspended in waterproof MDF with 20mm thickness, lacquered in white 11. Cabinet in waterproof MDF with 40 and 20mm thickness, lacquered in white 12. White compact marble top with 15mm thickness 13. White tiles 10x10cm 14. Cabinet in MDF with 40mm thickness

2012_europaconcorsi_n10_11_section-details_large

33