Progetti
Copertine
Nuovi
Concorsi
Albums
Dettagli
Newsletters
Lublin, Poland

Renovation of the Lublin International Airport in Poland

06---1200-x-1000-px_large

These days airports have become the showcase for a city or region, emerged as gates to local realities. Dynamism and frankness of Lublin region were the issues to express during the design process. We gained inspiration from aero dynamic solutions for airplanes and disposition of air currents on the competition site. These were taken under consideration during the design process and emerged as an elegant pillow-like structure.

07---1200-x-1000-px_large

We placed the first phase of airport buildings along the planned runway lane to create a stripe of buildings. On the perpendicular axis of the stripe we placed a central component of the design – Terminal building. The railway station, connecting the terminal with the city, was designed as a part of the terminal itself with the access situated on the extension of the lateral axis. Such an arrangement provided a logical division of circulation around the terminal to the arrival and departure zones with the railway placed in between. It also allowed distribution of all required functions on a single level.

09---1200-x-720-px_large

Parallel situation of buildings and the runway allows the future expansion of the terminal and the airport itself.

10---1200-x-720-px_large

Road access to the Terminal is provided with two one-way road junctions serving separately the arrival and departure zones.

01---1200-x-600-px_large

The main high capacity building is the terminal building. It was designed as a three-wing hall containing both functional zones: the airside zone, enclosing luggage sorting plant, waiting rooms and luggage claim hall with all accompanying rooms as well as the landside zone enclosing check-ins, railway station and commercial facilities like airline offices and gastronomy etc.

02---1200-x-1710-px_large

Sizes and parameters for the Terminal were assumed in accordance with IATA guidelines and counted for the capacity of 1 million passengers for the first stage and 3,2 million passengers terminally.

11---750-x-850-px_large

Design team members:

12---750-x-500-px_large

SENER INGENIERIA Y SISTEMAS S.A. (technical coordination, airport master plan, functional project of terminal, calculate of buildings area and number of parking places)

03---1200-x-1000-px_large

inż. lotn. Francisco José Rodriguéz Angelina, mgr inż. Karol Cichecki, inż. lotn. Fernando Mosquera Martinez, inż. lotn. Gorka Agustín González Iraeta, inż. lotn. Pablo Querol Suquia, inż. lotn. Nestor Matabuena Durango

04---1200-x-1000-px_large

ARE Sp. z o.o. (architectural design of the terminal building, flight control tower, administration building and airport maintenance facility building, graphical presentation)

05---1200-x-1000-px_large

arch. Jakub Wacławek, arch. Grzegorz Stiasny,

08---1200-x-1000-px_large

arch. Tomasz Starczewski, arch. Adam Kluczek, arch. Krystyna Godlewska, arch. Aleksander Krauze, arch. Izabela Bartosik, arch. Bartosz Świniarski, arch. Maksym Tkacz, tech. arch. Rafał Lichota

SENER Sp. z o.o. (parking and airport circulation system, coordination of work)

mgr inż. Piotr Szczepański, inż. lotn. Lope Seco González, arch. Marcin Tomaszewski, mgr inż. Piotr Rebajn, mgr inż. Bernard Kendra, mgr inż. Tomasz Gutkowski, mgr inż. Jacek Chamioło

POLCONSULT Sp. z o. o. (runway infrastructure)

mgr inż. Ryszard Zaremba, arch. Janusz Stanisław Targowski, mgr inż. Zygmunt Kulesza