Europaconcorsi

Schiphol, Netherlands - Realized work - January 2009
Architectenbureau Cepezed
the outlook
Theoutlook
Published on March 20, 2009

A very modern office building, designed according to American model, with an open, light, and pavilion-like atmosphere, much overhead space on each storey, and extra-wide office bays with a minimum amount of columns. The building is situated at a strategic location at Schiphol-Centre, with easy international access, opposite the head office of the Schiphol Group. The project has been realized in two stages and provides more than 38,000m² of office space and 850 parking places. The first stage covers 19,898m² and 450 parking places, of which two thirds are utilized by the Dutch head office of the software giant Microsoft. The main structure comprises a series of longer and shorter office bays linked in a finger-joint configuration. Two subterranean storeys and the plinth of the building accommodate the parking facilities. The office floors allow a flexible layout and are mutually connected by large vides and representative staircases. The flexible and efficient structure provides the owner, Schiphol Real Estate, with an opportunity to anticipate the individual spatial requirements of the various tenants. The combination of a steel skeleton with concrete hollow-core floor slabs is optimally used in an intelligent and economic construction that enables extra-wide office bays with large spans and a minimum amount of columns. An overhead space of no less than 2.90m gives a pleasant feeling of spaciousness. The façades are largely implemented in glass without vertical struts, allowing the incidence of much natural light. The vides, which are roofed over with skylights, also contribute to the abundance of daylight in the building.

address evert van beekstraat schiphol-centrum

client schiphol real estate schiphol-centrum

gfa first stage 19,900m² office space and 13,390m² parking space second stage 18,100m² office space and 12,500 m² parking space

realization first stage 2007 second stage 2009

Designer
Architectenbureau Cepezed
Photo by
Fas Keuzenkamp
Consultants
Structural engineering
Stability consultant: dhv-d3bn, the hague
MEP
Physics consultant: peutz, zoetermeer
Installations consultant: dhv-temid, the hague
Landscape
West 8, Rotterdam
Fact Scheet
Additional Notes
Users: Microsoft, Van der moolen
Client
schiphol real estate
Dimensions
Built Surface
first stage 19,900m² office space and 13,390m² parking space second stage 18,100m² office space and 12,500 m² parking space
Buildings
Structure
Construction combination J.P. Van Eesteren-Voormolen bouw, Barendrecht
Steel construction: Smulders-Duscon, Bladel
12 images
Fas_keuzenkamp-micros
Fas_keuzenkamp-micros
Fas_keuzenkamp-a4-1354_normal
Fas_keuzenkamp-a4-1353b_normal
01-situation_normal
02-ground-floor_normal
03-floor-plans-and-section_normal
04-elevations_normal
05-cross-section_normal
06-fragment-section_normal
07-details-1_normal
08-details-2_normal