Projects
Frontcovers
Top Favorites
Latest
Competitions
Albums
Details
Newsletters
Maarheeze, Netherlands

Meander

Exteriour__part_b__position_8_large

At the location of the former shopping centre “de Brink” and where a care home (Marishof) and ten sheltered houses were situated. At this location has been designed a new care housing for elder people.

Outside__part_c___position_6_large

This projects exists in four parts.

Outside__part_d___position_3_large

-30 houses for seniors (part A) orientated to the square “ de Brink” and an extension of the Floralaan divided into 2 to 3 stories.
- 54 residential homes for more elder people (part B) spread over three stories situated at the Floralaan and Hagelkruis.
- 30 rooms for elder people how need more treatment and attention (part C) are directed to Hagelkruis and the Lavendelstraat.
- These parts are connected by the “meander” in this order(part D) . The meander symbolizes the phases of life which the future occupants will follow or experience, seen in time .

Outside_part_b___position_4_large

It is also the aorta of the complex that provides the following main functions:

09-01-07_straatgevel_large

-day care
-recreation and welfare
-treatment functions
-management, administration and personnel
-supporting services
-space for nursery and care apartments

Exteriour__part_d__position_9_large

The region and the history around Maarheeze( region Eindhoven) are a reason for the use of material, colour and texture. It is a translation of a historical rural substance into a coded message. This will be visible when intensively studying the building. In small amounts, images of “recognition” come up in our consciousness and because of that, acceptance of relative large extra care housing in a small community is being simplified. The materials are distracted from the rural scenery and the process of transience. After a while they show light grey patina. We have developed a special concrete large brick for this project in the spirit of “Cradle to Cradle”. It was produced not far from the site with low energy cost and it can be reused if necessary

Inside_part_b___position_5_large

Inside_part_b___position_7_large

Situation_1_large

Situation_2__large

Floor_plan_groundfloor__large

26-04-2009_section_part_a__large

North_facade_large

4