Esito 22 Gennaio 2009. Pubblicato il 22 Gennaio 2009. Rating 176
Concorso a partecipazione aperta in due fasi per la relizzazione del Taipei Performing Arts Center. Il programma prevede la costruzione di un complesso dotato almeno di 3 sale teatrali: una da 1500 posti e due da 800 posti ciascuna. Costo di costruzione previsto: US$124,600,000.
Iscrizione: 21/10/2008, consegna elaborati 1a fase: 21/10/2008. Giuria 1a fase: 24/10/2008. Giuria finale: 22/01/2009
Concorso a partecipazione aperta in due fasi per la relizzazione del Taipei Performing Arts Center. Il programma prevede la costruzione di un complesso dotato almeno di 3 sale teatrali: una da 1500 posti e due da 800 posti ciascuna. Costo di costruzione previsto: US$124,600,000.
Giuria:
Shu Chang, Louisa Hutton, Gene K. King, Stan Lai, Mohsen Mostafavi, MACK Scogin, David Tseng
—-—-—-—-——-
The main purpose of this project is to build a Performing Arts Center to serve a variety of large-scale performances, including dramas and operas. The main structure will contain three theaters: a 1,500-seat Grand Theater, and two 800-seat theaters for repertory performances. These performance spaces must fulfill the specific needs of many different styles of performing arts. The Taipei Performing Arts Center will be a professional-level facility that meets international standards, providing a world-class performing arts venue for the Taipei area.
Type of Competition: Two-stage open competition.
Total Construction Budget: NT$3,800,000,000 (about US$124,600,000.)
Giuria: Shu Chang, Louisa Hutton, Gene K. King, Stan Lai, Mohsen Mostafavi, MACK Scogin, David Tseng
The main purpose of this project is to build a Performing Arts Center to serve a variety of large-scale performances, including dramas and operas. The main structure will contain three theaters: a 1,500-seat Grand Theater, and two 800-seat theaters for repertory performances. These performance spaces must fulfill the specific needs of many different styles of performing arts. The Taipei Performing Arts Center will be a professional-level facility that meets international standards, providing a world-class performing arts venue for the Taipei area.
Type of Competition:
Two-stage open competition.
Total Construction Budget:
NT$3,800,000,000 (about US$124,600,000.)
Service Fees:
The service fees for this project is a fixed fee in the total amount of NT$ 570,000,000. (about US$18,680,000)